Collinsville,
Oklahoma
January 14, 2019 New CUE Classrooms |
The new class room wing being constructed on the west side of Collinsville's Upper Elementary (CUE) is ready for sheetrock inside and bricks have started up on the outside this weekend. The new eleven rooms should easily be ready for teachers and students in August 2019. A sample of earlier progress is shown below. | ||||
A
view of the new slab from the existing CUE hallway (between the library
& gym).
|
||||
The gravel construction road (to the CUE from 126th St. N) will eventually be asphalted and serve as the entry loop for CUE students to help reduce 129th St. E. Ave congestion serving three campuses now. | ||||
|
b